We have pulled out some samples from our workshop for a client this week. One is a left over section from a fireplace and the smaller of the two was …
A busy day in Cheshire today making safe a sandstone gate post on a grade 1 listed property.
A busy day in Cheshire today making safe a sandstone gate post on a grade 1 listed property. This post had roots growing into the side lifting the post into …
Preparing the lime motar mix to comply with conservation guidelines with listed property.
Preparing the lime motar mix to comply with conservation guidelines with listed property. Preparing the lime motar mix to comply with conservation guidelines with listed property. If you’d like the …
Sandstone keystones ready for delivery onto the wirral for a listed property restoration.
Sandstone keystones ready for delivery onto the wirral for a listed property restoration. Sandstone keystones ready for delivery onto the wirral for a listed property restoration. If you require the …
Some scale drawings we have finished ready for the customer approval for their grade two listed property. The original entrance is to be restored back to the original design after being dropped in hight and having some of the stone work sto
Some scale drawings we have finished ready for the customer approval for their grade two listed property. The original entrance is to be restored back to the original design after …
Some scale drawings we have finished ready for the customer approval for their grade two listed property. The original entrance is to be restored back to the original design after being dropped in hight and having some of the stone work sto
Some scale drawings we have finished ready for the customer approval for their grade two listed property. The original entrance is to be restored back to the original design after …
Just finished our site meeting at the new big project of a grade 2 listed property. Up at 4am tomorrow trying to get as many hours in as possible 100 hour weeks are the norm. Building a feature and history at the same.
Just finished our site meeting at the new big project of a grade 2 listed property. Up at 4am tomorrow trying to get as many hours in as possible 100 …